Sewer Watermain I: Trunk Watermain

CONTRACT NO. 3 2021
SEWER AND WATERMAIN I:
TRUNK WATERMAIN
Sealed tenders marked Sewer and Watermain I: Trunk Watermain
– Contract No. 3, 2021 will be received on the steps of City
Hall, 500 Donald St E, Thunder Bay, ON P7C 5K4 by the Supply
Management Representative, between 11:00 am and no later than
12:00 noon, local time on:
THURSDAY, MARCH 11, 2021
Supply Management will place a clearly marked container to
receive tenders, at the front of City Hall. The container will be
made available to receive tenders one hour prior to closure and
removed at time of closing. The container will be monitored by a
Supply Management Representative. Public tender openings have
been suspended due to COVID-19 precautions.
Uno cial tender results will be posted within seventy-two (72)
business hours on the City’s Tenders website
https://thunderbay.bidsandtenders.ca/module/tenders/en
The clock used to identify the time that the container is present,
to the time that the container is removed, will be the clock on the
Supply Management Representative’s cellular telephone.
This project requires extensive company experience with large
diameter trunk watermain construction.
Under this Contract:
Approximately 1,325 tonnes of HL4 asphalt, 2,300 tonnes of
Granular A, related excavations, 500 linear meters of 600mm trunk
watermain, 750 linear meters of 300mm trunk watermain, related
appurtenances and service connections, 220 linear meters of
sanitary sewer, 400 linear meters of concrete sidewalk, 900 linear
meters of curb and gutter and 375 cubic meters of rock breaking
and removal.
To arrange pickup or drop o of Contract 3, 2021 please call
807-625-2266. Tenders can be paid for over the phone, for a nonrefundable
fee of $50.00 per set. The lowest tender or any tender
will not necessarily be accepted.
BRIAN NEWMAN, P.ENG.
PROJECT ENGINEER
INFRASTRUCTURE OPERATIONS
thunderbay.ca

Company: 
City of Thunder Bay
Start Date: 
Saturday, February 20, 2021
End Date: 
Saturday, February 27, 2021